in Dakar Senegal  sales   price   shop   near me   near me shop   factory   supplier Customized Steel Door Frame Roll Forming Machine manufacturer   best   Cost   Custom   Cheap   wholesaler

Additionally, all our production methods are in compliance with ISO9002 expectations. we supply chromed bar and tubes for hydualic and pheumatic cylinders. In 2008, it was awarded with “National Export Commodity Inspection-totally free Organization”. Steel Doorway Frame Roll Forming EPTT

EPT
EPT Thickness:.seven-1.2mm

EPTT Factors
Feed EPT System

2) Primary EPTT
With feeding content XiHu (West EPT) Dis.Hu (West EPT) Dis., body frame manufactured from H400 sort steel by welding
Facet wall thickness: Q235 t18mm
Rollers manufactured from 40Cr steel,CNC lathes,Warmth Treatment,challenging Chrome Coated
Shafts Diameter= #109275mm,precision EPTTd
EPT/EPT driving,about 14-phase to form
Main EPT=11KW , Frequency velocity control
Genuine forming pace 15-18m/min (Not incEPTT reducing time)

Publish EPT Punching Chopping Device
Post to minimize, cease to slicing,Two parts type of reducing blade design, no blanking
EPT motor: 3KW Reducing stress: -14Mpa
Reducing tool material:Cr12MoV,Warmth remedy to EPTC58-62 diploma

four)PLC EPTT Technique
EPTT The EPTtity And Cutting Duration EPTTally
Enter The Production Info(Production Batch,pcs,Size,and so forth.)On The Contact Screen ,
It Can End The Manufacturing EPTTally.
Combined With: PLC, Inverter, Touch Display, Encoder, and so forth
PLC:EPT (German manufacturer)/Schneider(French manufacturer)
7-Inch EPTT Contact Monitor:EPT (German brand name)/Schneider(French brand)
Encoder: Omron (Japan brand name)
Thermal Relay: EPT (German manufacturer)/Schneider(French brand name)
Air Change: LG-LS(Korea model)
Minimize-to-Size Tolerance le plusmn1 mm
EPTT Voltage 24V

5)EXiHu (West EPT) Dis.t Rack: Un-EPTTed, Two Units,with rollers on it for straightforward motion

Right after-Sale Service
one. The warranty is 24 months after the shopper EPTs the EPTT.
Within the 24 months, we will courier the substitute components to the consumer free of charge of demand
2. We offer you specialized help for the total lifestyle of our EPTTs
three. We can send our technicians to put in and train the staff in the clients’ factories with
extra EPT

Phrases Of EPT
one.Least get quantity (MOQ): one Established
2.Delivery time: about 45 workdays
3.Port of loading: port of HangEPT
4.Variety of payment: by T/T or by L/C
five.Export:to far more than 60 nations around the world and locations, incXiHu (West EPT) Dis.Hu (West EPT) Dis. EPTTiwan, British isles, France, Singapore,
Greece, Australia, Usa, MeXiHu (West EPT) Dis.co, Brazil, Chile, EPTTvia, Trinidad, Israel, Saudi Arabia, and many others

EPTT Style
EPTT approach: Major body of EPTT is bare and lined by plastic movie(to defend of dust and corrosion),
loaded into container and steadily fastened in container suitable by metal rope and lock, suited for EPTT-length transportation.

Making time: about 45 workdays after EPTd the EPT payment
Period of Validity for Value: thirty days from quotation day
EPTT approach: with nude EPTT steadily fixed in a single 40 toes container suited for
EPTT-length transportation

ABOUT BMS
Manufacturing unit

Certification

Consumer

Top quality IS OUR Society!

IF U ARE Fascinated OUR EPTTS ,
Remember to Contact WITH ME!

  in Dakar Senegal  sales   price   shop   near me   near me shop   factory   supplier Customized Steel Door Frame Roll Forming Machine manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Dakar Senegal  sales   price   shop   near me   near me shop   factory   supplier Customized Steel Door Frame Roll Forming Machine manufacturer   best   Cost   Custom   Cheap   wholesaler